SureshReddy408 views

Candeur Arbora Kukatpally: Full project data & RERA update (P02200011363)

Remember a few months back when I posted about Candeur taking up that ~20 acre land parcel near IDL Lake in Kukatpally when it was just in preliminary talks? Well, I finally got my hands on the full official layout data and cost sheets now that the TG-RERA approval is officially through under P02200011363.


Updating the launch calendar thread with the complete breakdown:

Land Parcel: 80,941 sqm (~20 Acres total)

Phase 1 Setup: 6 Towers (A to F) + G+5 Standalone Clubhouse

Phase 2 Setup: 5 Towers (G to K) going up 25 to 29 floors


Unit Layouts: Exclusively 3 BHK flats across 4 distinct size bands:

Compact (Type 1): ~1,550 to 1,575 sft

Medium (Type 2): ~1,655 to 1,830 sft

Large (Type 3): ~1,830 to 1,965 sft

Spacious (Type 4): ~2,048 sft


Regulatory Status: TG-RERA Approved (P02200011363)

Having the actual RERA number in place definitely gives more confidence than those early pre-launch rumors. Still, with 11 high-rise towers coming up on Green Hills Road, I'm curious how the local infrastructure will handle peak-hour traffic once thousands of families move in.

For anyone looking to book in Phase 1 vs waiting for Phase 2, how are you modeling the Pre-EMI vs Full EMI cash flows over a 4-year construction window? Has anyone gotten the final floor-wise cost sheet from the builder yet?

Discussions

Lakshmi36
The unit size breakdown is very practical. The 1,550 sq ft compact 3BHK (Type 1) is a great entry ticket for nuclear families, while the 2,048 sq ft spacious 3BHK gives a luxury feel without hitting 3,000+ sq ft price levels.
mahima9x

@Lakshmi36 Agreed! The 1,655–1,830 sq ft Medium Type 2 seems to be the sweet spot for usable carpet area and ventilation.

ganesh6b4n

@Lakshmi36 Layouts are well-designed, but I personally prefer ready-to-move options to avoid waiting out a 4-year construction schedule.

chandan5m2k
Being right near IDL Lake adds good aesthetic value, but civil engineering for foundation piling near water bodies must be checked thoroughly. A G+5 standalone clubhouse across 20 acres will be a major selling point for tenants.
tara99

@chandan5m2k Having a large dedicated clubhouse and open green space right in Kukatpally is fantastic for families with kids!

ravishankar4b6n
Green Hills Road in Kukatpally is already congested near JNTU and KPHB Metro stations during peak hours. Adding 11 high-rise towers on a 20-acre parcel right next to IDL Lake will cause serious bottlenecks unless local access roads are widened.
venkat3m8k

@ravishankar4b6n Agreed. KPHB is densely populated, but having KPHB Metro just 5 minutes away is a huge relief if you commute toward HITEC City or Begumpet.

arun3k7n

@ravishankar4b6n Compared to Bangalore's Silk Board or Outer Ring Road, Kukatpally's metro connectivity and flyover grid make daily commuting much smoother.

atul3m5k
Has anyone received the actual base price per sq ft for Phase 1? With a 4-year construction window, taking a pre-EMI option looks tempting to manage monthly outgo, but I want to make sure holding costs don't eat into returns.
shravan7n2b

@atul3m5k Be careful with pre-EMI over a 4-year timeline. If construction or finishing slips past 2030, you'll end up paying full EMI alongside current house rent.

sanjay8m3k

@atul3m5k The floor-wise cost sheet shows base prices starting around ₹7,800/sq ft with standard floor rise charges. Pre-EMI works fine if you hold a 1-year liquidity buffer.

shiva6m3k
TG-RERA approval P02200011363 gives solid regulatory clarity. Make sure to check the RERA-approved completion milestones for Phase 1 (Towers A-F) vs Phase 2 separately before signing the agreement of sale.
akshay2n6b

@shiva6m3k Good advice. Having an active RERA registration number eliminates pre-launch legal risks completely.

bhanu4b6m

@shiva6m3k Checking RERA completion dates is essential when planning to liquidate existing property to fund progressive construction installments.