Miyapur

10 Sept 2026

img
sreeaarunyar...view-icon
15 views

ARIA by Team4 LifeSpaces in Miyapur, Hyderabad


ARIA by Team4 LifeSpaces is an under-construction, ultra-luxury high-rise residential landmark located in the rapidly growing corridor of Miyapur, Hyderabad

Miyapur's tallest and greenest gated community projects.


📋 Project Summary


🏹 RERA Registration ID: P02400010543

🏹 Total Project Area: 12.5 Acres

🏹 Open Space Percentage: 80% Open/Green area

🏹 Total Structural Towers: 7 Iconic High-Rise Towers

🏹 Number of Floors: G + 48 Storeys (Height: 220 Meters into the skyline)

🏹 Substructure: 6 Basement levels + 1 Stilt level for dedicated vehicular parking

🏹 Total Inventory Size: 3,020 Premium Residential Units


📐 Unit Layout Configurations


🦚 3 BHK (Standard): 1,655 – 1,750 SFT

🎯 3 Bedrooms, 3 Toilets, Living Room, Kitchen, Utility, Single Balcony

🦚 3 BHK (Premium): 1,975 – 2,075 SFT

🎯 3 Bedrooms, 3 Toilets, Expansive Living & Dining, King-size Balconies

🦚 3.5 BHK (Luxury): 2,075 – 2,285 SFT

🎯 3 Bedrooms, 3 Toilets, Drawing Room, Puja Room, Home Office / Servant Quarter

🦚 4 BHK (Ultra-Luxury): 2,465 – 2,665 SFT

🎯 4 Bedrooms, 4 Toilets, Double Balconies, Formal Drawing room, Powder Room


Highlights of ARIA


3.15-meter (10.5 ft): Floor-to-floor ceiling height

Main Door: 8-Foot high engineered wooden frames

Internal Doors: 7.5-Foot high hardwood frames

Elevator System: Highly efficient 1:1 Lift-to-Home ratio

Sanitary Ware: Luxury fittings (Kohler, Toto, or Grohe equivalents)


🏊‍♂️ Clubhouse & Amenities


💎 3.5-Acre Courtyard: Massive, vehicle-free central green lung zone

💎 100,000 Sq. Ft. Club: Entertainment zones featuring a fully automated Gym, Spa, Unisex Salon, Private Mini Theatre, Yoga/Pilates deck, and co-working digital cafes

💎 Triple Pool Deck: Olympic-sized swimming pool at ground level, an active kids’ water park, and a high-altitude rooftop infinity pool on the podium tier

💎 Eco-Infrastructure: 7 separate parking facility basements equipped with scalable EV charging stations, centralized sewage treatment plants (STP), and water softener filtration structures.


Project Handover Phase: Scheduled for January 2031


📲 Connect For Bookings & Site Visits

📞 Phone Call: +91 99491 44439

💬 WhatsApp Chat: Click to Chat on WhatsApp: Join my WhatsApp group. https://chat.whatsapp.com/Bx9WUaWBzhtHSZt0ikcDuR




















0 Comments